katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

Buck drove 220 miles in 5 hours. What was his average rate of speed?
Find an equivalent ratio for 22/55 and then write the proportion
16 increased by twice a number is -24. Find the solution??
How consumers behaviour affect market equilibrium
The graph of y = 4x - 11 is translated up 8 units. Which equation represents the translated graph? f y = 4x - 19 g y = 4x - 3 h y = 12x - 11 j y = 12x - 3
The diameter of your bicycle wheel is 25 inches. How far will you move in one turn of your wheel?
16 increased by twice a number is -24. Find the solution??
The number of waves that pass a particular point in a unit of time is called the __________ of the waves. (a) rarefaction (b) compression (c) amplitude (d) freq
What is the change in number of individuals in a population over time? A. population decrease B. population stability C. population growth D. population resista
The base of right prism is rhombus of diagonal is 6 and 8cm and altitude is 12 cm find total surface area