melanyperez890 melanyperez890
  • 02-11-2020
  • Mathematics
contestada

How much does programmer charge for a coding project that takes 6 hours?
A computer charges $45 an hour for coding projects plus start-up fee of $150

Respuesta :

25tristanme
25tristanme 25tristanme
  • 02-11-2020

Answer:

150 + 45h

Explanation:

Hope this helps.

Answer Link

Otras preguntas

WHAT COULD HAPPEN IN THE BODY IF PROTEINS OR ENZYMES LOST THEIR CONFORMATIONS OR WERE DENATURED?
What does this mean?The levying money for or to use of the crown by pretense of prerogative,without grant of parliament, for long time, or in other manner than
Convert 57 mL to its equivalent in L using dimensional analysis
There are 30 students in a class that took a test. The average grade of 10 students was 80. The other 20 students average was 89. What is the overall average fo
one meter is approximately equal to 39.39 inches. about how many inches are in 5 meter
What two numbers has a lcm of 50
Write the name of a shape that has no sides and no vertices
What is this answer?10y=360°
walter buys a bus pass for 30$. everytime he rides the bus money is deducted from the value pass. he rode 12 times and 24$ was deducted from the pass. how much
Write five names for 64 .