razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

I need a sentence for stodgy.
a runner runs at 7.6mph for 3 1/2 hours how many miles did he run
Which is used to measure the length of a bicycle trail? A. km B. kg C. kmi D. kL
How did the ideas of absolute monarchs conflict with the ideas of Enlightenment thinkers ?
What fractions are equivalent to 2/3
Use logarithmic differentiation to find dy/dx: y=((x^3)(2x+3)^1/2) / (x-2)^2
Give two reasons why some people are racially prejudiced.
Hot dogs at a carnival cost $2.99 each plus 7% tax. What is the total cost for one hotdog?
Tony spent $60.54 and bought 3 packs of notebooks and a calculator. How much does a pack of notebooks cost if a calculator cost $45.87 in a two step equation
A machine produces 40 spools of nylon each day. On the first day of production, 10 spools have to be thrown away. What percentage is thrown out?