kamalrawat187
kamalrawat187 kamalrawat187
  • 01-07-2021
  • Mathematics
contestada

A canning factory turns out 568 tins of jam on a certain day. How many tins will be produced in 297 working days? ​

A canning factory turns out 568 tins of jam on a certain day How many tins will be produced in 297 working days class=

Respuesta :

madukasundi157
madukasundi157 madukasundi157
  • 01-07-2021

Answer:

[tex]568 \: \times \: 297 \: = \: 168696.[/tex]

188,696 tins be produced in 297 working days.

☆ Don't forget to thanks

☆ Mark as brainlist.

Answer Link

Otras preguntas

in the system shown below, what are the coordinates of the solution that lies in quadrant I? x^2-y^2=25, x+y=25
The united states has _____ court systems.
Solve 4 log12 2 + log12 x = log12 96. Choose one answer.. a. x = 88. b. x = 80. c. x = 12. d. x = 6
Maria no es alta; es muy ________. A.) baja B.) inteligente C.) trabajadora D.) bajo
The Game Room Of The youth center needs carpet . Sweat T found that the room Measures 12 Inches by 8 inches on the blueprint of The Scale of The Blueprint is 1
Approximately 7% of people are left-handed. if two people are selected at random, what is the probability of p(one is right-handed and the other is left-handed)
Determine the zeros of f(x) = x3 + 7x2 + 10x − 6
Please solve this one
The purpose of a program is to provide listeners with
The word carbohydrate is derived from carbon and water (hydrate). explain why this combination correctly describes this chemical group.