Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

how to get rid of alcohol breath
jim loves the outdoors. he is interested in different types of plants and flowers and also likes digging for fossils and old artifacts. jim is most likely stron
the underline format will underline ____.
Historical claims that are logically and factually strong are said to have ? A. Causation B. Bias C. Correlation D. Validity
frequently asked questions in interview
what is the difference between heterozygous and homozygous individuals?
how much does a physical therapist make
-5x-4=? a.1 b.-1 c.20 d.-20
advantages and disadvantages of coal
drag each phrase to the appropriate bin depending on whether it describes the synthesis of the leading strand, the synthesis of the lagging strand, or the synth