hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

LITERARY ANALYSIS: How does the author use the historical setting to create complex yet believable characters? Choose one or two characters to focus on and use
The Venn Diagram shows the relationships among different sets of numbers. Which number would be located in the shaded part of the diagram?
Write an equation for a line perpendicular to y = -5x – 4 and passing through the point (15,5)
Solve the following expression.
will give brainliest
Select ALL the correct answers. This cartoon from the campaign of 1896 shows William Jennings Bryan on a whistle-stop tour of the country. Journalists and a new
A rectangle has a perimeter of 58 cm. Its length is 5 cm longer than its width. What are its dimension?​
could someone help me solve this its kinda hard k-16=(-6)
Translate point G located at(-4,0) +5 in the x-direction and -3 in the y-direction
Why do you need to wear a seatbelt when you are in a car?